FORWARD TO A FRIEND

Sending...

EMAIL UPDATES

Stay updated for - Construction in Finance & Commerce, please enter your contact information below.

2022 Street Reconstruction Project
Want these enhanced features? Subscribe Now!
Due
***
City
***
State
***
County
***
Want these enhanced features? Subscribe Now!
Company
***
Ad Text
2022 Street Reconstruction Project

January 21, 2022

ADVERTISEMENT FOR BIDS ————— CITY OF LAKEVILLE 2022 Street Reconstruction Project CITY IMPROVEMENT PROJECT NO. 22-02 NOTICE IS HEREBY GIVEN that sealed electronic bids will be received by the City of Lakeville at the office of the City Clerk until 10:00 a.m. CST, Wednesday February 23, 2022, at the Lakeville City Hall, 20195 Holyoke Avenue, Lakeville, MN 55044, through the City of Lakeville's online electronic bid system (BidVAULT). At that time bids will be opened and posted publicly by representatives of the City of Lakeville. Bid results and tabulations may be viewed on the City of Lakeville's Public Dashboard at https://mn-ci-lakeville.app.rtvision.com/oneoffice/public/bidding. Said proposals for the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities: 26,200 L F Remove and Replace Concrete Curb and Gutter 130,000 S Y Full Depth Reclamation 11,500 TON Type SP 9.5 Wearing Course Mix (3,C) 19,200 TON Type SP 12.5 Non Wearing Course Mix (3,C) 6,000 L F Pavement Markings 80 EACH Bolt & Valve Box Replacement - Hydrant & Hydrant Valve 82 EACH Bolt & Valve Box Replacement - Valve 1,500 L F 12" - 48" RCP Storm Sewer 210 L F 48" - 96" Storm Sewer Drainage Structures 1 EACH Storm Sewer Drainage Structure Special - V2B1 or Equal 1 EACH Storm Sewer Drainage Structure Special - SAFL Baffle or Equal The bids must be submitted on the Proposal Forms provided in accordance with the Contract Documents, Plans, and Specifications dated January 18, 2022, as prepared by WSB for the City of Lakeville, which are on file with the City Clerk of Lakeville. The Plan Holder Data project files may be downloaded at https://mn-ci-lakeville.app.rtvision.com/oneoffice/bidding (Projects in Bidding). ONLY REGISTERED PLANHOLDERS WILL BE ALLOWED TO BID PROJECT. Bidders are responsible for all present and future downloads, including addendums and their attachments. BIDS WILL ONLY BE ACCEPTED BY SUBMITTING AN ELECTRONIC BID USING BIDVAULT at https://bidvault.mn.uccs.com NO HARD COPY BIDS WILL BE ACCEPTED. Instructions on submitting a bid electronically can be found on the bidVAULT website. The cost to submit a bid is $25 (plus online payment vendor convenience fee). No bids will be considered unless accompanied by a certified check, or bid bond made payable to the City of Lakeville for five percent (5%) of the amount bid, to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required bond. The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of the Owner. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The City of Lakeville reserves the right to reject any or all bids. CONTRACTOR ACKNOWLEDGEMENTS: (1) Any prime contractor or subcontractor that does not meet the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. § 16C.285, subd. 3, or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded a construction contract for the Project or perform work on the Project. (2) Responsible contractors shall submit to the City a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. § 16C.285, subd. 3, at the time that it responds to this solicitation document. (3) A prime contractor shall submit to the City, upon request, copies of the signed verifications of compliance from all subcontractors. (4) A false statement under oath verifying compliance with any of the minimum criteria shall make the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement. DATED: January 18, 2022 BY ORDER OF THE CITY COUNCIL s/s Charlene Friedges City Clerk Lakeville, MN (Published in Finance and Commerce January 21, 2022) 12070810

Prior Ad #

Ad # 23338445
St. Paul Legal Ledger has abstracted these listings from public notices submitted to us for publication, which we do not independently verify. Where we've been able to enhance listings with supplementary information, that information is unofficial and uncorroborated. For the official version of a public notice, consult the print edition. BridgeTower Media assumes no responsibility for any errors or omissions in these listings and makes no representations regarding their accuracy or reliability.